Prepare your inquiry
Copy this checklist into your message and add the details you have. Include the original ratings, quantity and destination.
Quotation checklist
Equipment / motor model:
Original capacitor model:
Circuit function: run / start / dual-run / unknown
Original rating: ______ µF (dual-run: ______ + ______ µF) · ______ VAC
Tolerance / frequency / duty markings:
Body, mounting and installed dimensions (mm):
Lead or terminal arrangement:
Quantity and destination market:
Documents required:Send your capacitor requirements
Tell us which capacitor you need, how many, and where the order will go.
Use the online form for written requirements and send photos or drawings by email or WhatsApp. If you have already submitted the form, include your inquiry reference with the files.
Help completing the checklist
Motor and electrical specifications
Record the equipment and motor model, circuit duty and wiring diagram. Copy µF, VAC, tolerance and frequency from the original label. For dual run, include both capacitance values.

Dimensions and connections
Give body and installed dimensions in mm, including fixing hardware and connection clearance. Show the lead or terminal layout, connectors and terminal groups.
Measure the case and connectionsQuantity and model documents
State the order quantity or forecast, destination and label requirements. List the samples, drawing, datasheet, certificates and test reports needed for the selected configuration and market.
5,000 pieces in total across mixed models. Confirm the quantity for each model in the quotation.
Free test samples are available for eligible models. Confirm the sample quantity, any customisation charges, freight and preparation date before dispatch.

Approve the sample
Compare the sample’s ratings and connections with the agreed drawing. Keep the approved label artwork and packing revision with a customised order.
OEM requirements and sample approvalConfirm the order
Your order should name the exact model and drawing revision, quantities, price and delivery terms. Keep the approvals together and put any agreed changes in writing.
Order & shipping checklist
Check packing & dispatch
The packing record should match the approved labels, protection and quantities. List inspection release, carrier pickup and departure separately, with each date marked confirmed or estimated.
Packing and dispatch detailsReview shipping documents
Compare the invoice, packing list and transport record with the order. Agree any extra documents required for the destination or shipping route.
Shipping document checklistChoose a capacitor series
Browse applicationsHelp choosing a series
Equipment type
Run and start duty for pumps
Use CBB60 for run duty and CD60 for switched start duty. The pump motor diagram identifies whether it uses one capacitor or both.



